SKIP TO MAIN CONTENT

F&ED This Week

June 7, 2021

A freshly-poured sidewalk bordered by plantings and newly-installed lights sits atop a curving riverbank spanned by a black metal bridge.

Landscaping work continues along the banks of Cottonwood Creek between the Bioengineering Science Building (BSB) and Callier Center Richardson (CR), with a new bridge, improved sidewalks, more lights, and many new trees.

 

< View a Different Week