Despite the rainy weather, construction continues on the Edith and Peter O’Donnell Jr. Athenaeum, which is still on track to open in 2024. At this stage, the unique texture of the building’s stone outer panels can be seen. This feature will change the character of the building throughout the day and throughout the seasons as the light on campus changes.