SKIP TO MAIN CONTENT

F&ED This Week

October 28, 2024

Baskets of fresh vegetables arranged on the ground and stacked atop crates near a small wooden sanwichboard posting their prices on a chalkboard.

UT Dallas just opened the first phase of the Edith and Peter O’Donnell Jr. Athenaeum, and the next phase is already under construction. This second building will be dedicated to music and the performing arts. The new facility is expected to include several rehearsal spaces, offices, and a 680-seat performance hall.

 

< View a Different Week