SKIP TO MAIN CONTENT

Campus Transformation Timeline

2024

< 1964 1965 1966 1972 1973 1975 1978 1981 1988 1989 1992 1998 2002 2003 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2023 2024 >

Edith and Peter O’Donnell Jr. Athenaeum, Phase 1

Edith and Peter O’Donnell Jr. Athenaeum, Phase 1

  • 68,459 gsf.
  • Galleries, lecture rooms, space for art conservation and offices
  • Home of the Trammell and Margaret Crow Museum of Asian Art and the Brettell Reading Room

Beam Signing Video >

Construction Video >

Ribbon-Cutting Video >